Core Environmental Monitoring *Monthly Sampling

Get Connected Icon Until Jan 26, 2026
Get Connected Icon *Hours include total sampling time, including travel

Description

Before registering for this opportunity, be sure you have contacted texasstreamteam@fortworthtexas.gov and been assigned an approved Monitoring Site and Standard Core Kit location. 

Please monitor your assigned Site(s) monthly at the same time of day each month, for a one year commitment. For example: a possible monitoring schedule could be the first Sunday of each month at 10:00 am. Adherence to a consistent monitoring time is crucial because the physical and chemical parameters fluctuate over a 24-hour period. Monitoring takes approximately one to two hours per month per site *be sure to include your travel time in your total hours. 

Remember to check-out your assigned kit and return it within 3-4 days to ensure other citizen scientists also have access. 

Equipment Needed to Complete Monitoring:

  • Standard Core Kit (with unexpired reagents)
  • Bucket w/ rope
  • Deionized (DI) Water
  • Waste Container
  • Gloves
  • Conductivity Standard (1413 uS)
  • Transparency Tube or Secchi Disc

Be sure to dress weather appropriate and be safe while sampling. Thank you for your contributions towards protecting Texas' natural resources!

Standard Core Field Guide and Monitoring Forms

 *scan to enter your data using the Electronic Monitoring Form

Details

Get Connected Icon 14 and older
Get Connected Icon Is Outdoors
Inclement Weather Plan: Remember safety is our top priority! If weather conditions are unsafe on your designated date of sampling, complete your sampling at the next safe opportunity.
Get Connected Icon Requires: TX Stream Team Certification Class
Get Connected Icon Requires: Parental Consent Form (minors only)